Yunus Energy 50 MW Wind Farm Project

Yunus Energy 50 MW Wind Farm Project

Wind Power in Pakistan

Expertise
Climate action project development

Key facts

  • Location
    90 km east-northeast from the city of Karachi in Jhimpir, District Thatta, Sindh Province, Pakistan
  • Project Type
    Renewable energy – Wind
  • Annual GHG Emissions Reduction
    86,000 t CO2e
  • Project Standard
    CDM
  • Project IDs
  • Status
    Registered

Background

Yunus Energy Limited, the owner of the Yunus Energy 50 MW Wind Farm Project, is part of most respected Pakistani Yunus Brothers Group (YBG).

The history of YBG can be traced back to 1962 when the foundation of a trading house was laid. The establishment of the fabric trading business house, which turned into one of the largest conglomerates in Pakistan in a period spanning four decades, served as the first milestone in this journey.

Since then, YBG has established various other business units in Textile, Cement, Construction and Power Generation sectors and has proved its business standing in local and international markets. It owns one of the largest cement manufacturing facilities and the largest yarn manufacturing unit in the country.

YBG has decided to build and operate its own zero emissions wind farm to overcome energy supply shortages and, at the same time, seeking to avoid harmful climatic effects.

Project Description

The purpose of the Yunus Energy 50 MW Wind Farm Project is to utilize wind resources for electricity generation through the construction of a wind farm with a total capacity of 50 MW and to deliver the electricity generated from the project to the Water and Power Development Authority (WAPDA) grid. 

By replacing the electricity supplied by the WAPDA grid, which is heavily dominated by fossil fuel fired power plants, with electricity generated from wind power the proposed project activity will achieve considerable greenhouse gas (GHG) emission reductions.

The project, which belongs to the „first of its kind“ CDM projects in Pakistan, foresees the installation and operation of newest foreign manufactured wind turbines, which will supply an average annual generation of 138,900 MWh to the WAPDA grid thereby reducing the baseline grid emissions by an annual 86,000 t CO2e.

Services Provided

  • Pre-feasibility Study
  • Registration under CDM
  • Monitoring and Issuance of carbon credits

Sustainable development goals MORE DETAILS

No Poverty

No Poverty

Without clean, affordable and always available energy for businesses and households it will not be possible to fight the still widespread poverty in Pakistan. Thus, the creation of additional capacity for the generation of “green” wind power is an important precondition for developing the country economically and reducing the poverty of large parts of the Pakistani population.
Good Health and Well-being

Good Health and Well-being

A reliable supply with clean wind energy instead of fossil fuel use does not only improve general air quality in Pakistan and, consequently, the health of Pakistani people but also means that Pakistani hospitals and medical centers including their staff and patients do have to suffer less from frequent and sometimes life threatening power shortages and failures.
Affordable and Clean Energy

Affordable and Clean Energy

Pakistan’s fragile energy supply is still mainly based on expensive, dirty and exhaustive fossil fuels. More renewable wind power in Pakistan’s energy mix reduces this country’s costly dependency on imports of oil and coal, closes serious electricity supply gaps and promotes the establishment of a sustainable and climate-friendly energy sector in Pakistan that provides more people with access to affordable and clean energy.
Decent Work and Economic Growth

Decent Work and Economic Growth

Pakistan is facing acute energy supply bottlenecks. The project produces nearly 140,000 MWh per year and will therefore contribute to a reduction in the number of black-outs and brown-outs experienced by grid users. This can help to improve Pakistan’s overall economic performance. In addition, the project creates new quality jobs for local people both temporarily, during the construction phase, and permanently, during operation.
Industry, Innovation and Infrastructure

Industry, Innovation and Infrastructure

The project activity is the first-of-its-kind in Pakistan. By adopting innovative foreign manufactured wind turbines, the project will promote an important transfer of technical know-how to Pakistan and can act as a pioneer in promoting the spread of this technology to other wind power projects in the country.
Climate Action

Climate Action

The installation and operation of newest foreign manufactured wind turbines annually supplies 138,900 MWh of wind power to the WAPDA grid, thereby replacing electricity from fossil fuels and reducing the baseline grid emissions by nearly 86,000 tCO2e per year. This helps to improve Pakistan’s climate balance.

If you have any inquiries
about our service

Contact us